Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Vista Projects
Copper Tip Energy Services
Copper Tip Energy
Vista Projects


FREE WEBINARS May 5th & May7th: Shutdown and Turndown Considerations for Mechanical Integrity & Maximizing Margin


These translations are done via Google Translate

Current market conditions are forcing many refiners into an unfamiliar operating state.  A different approach may be required to rebalance and reduce refinery intake and maximize products that are still in demand.  Unit and equipment specific impacts of this approach will depend on the severity of the rate reduction as well as the duration.

Aligning with this topic, Becht is hosting a Fixed Equipment Mechanical Integrity on May 5 11:30am CDT and Maximizing Margin During Low Throughput on May 7 11:30am CDT. Join to listen to a global process, integrity, rotating equipment and turnaround specialist panel including Steve Treese, Clayton Smith and others from Becht.

In this 2-hour live webinar we bring you the following:

  • Top Risks
  • Key Symptoms of Issues
  • Recommended Actions

Join over 3,000 downstream professionals from 63 countries who have attended Becht’s Webinar Series. Over 300 questions were received from our clients and many were answered – share your questions and get expert insight!

FREE WEBINAR - Shutdown and Turndown Considerations for Mechanical Integrity & Maximizing Margin

Becht has additionally developed a Knowledge Library with high risk, high impact considerations by process unit (e.g. Crude) and major equipment type (e.g. Fired Heaters) for turndown, shutdown and long term idle operations.  You can download a free example of the Fired Equipment by clicking below. The Knowledge Library provides a framework for a discussion around high risk, high impact concerns, symptoms and consequence(s) stemming from this operational mode that most plants haven’t been in since the 1980s.

 

Becht Hosts on Demand Webinar Series on Alkylation & Fired Heater Unit Turndown & Shutdown Operations

 



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE