Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Zachry Integrity Engineering
Copper Tip Energy Services
Copper Tip Energy
Zachry Integrity Engineering


South Bow Targets 2027 Decision on Canada-US Oil Pipeline Revival


These translations are done via Google Translate

(Reuters) – Canada’s South Bow will decide whether to proceed with its proposed partial revival of the Keystone XL oil pipeline by mid-2027, the company said on Friday, as it announced it has secured the shipper commitments it was seeking to advance the project. The proposed 550,000-barrel-per-day Alberta-to-Wyoming pipeline, dubbed Prairie Connector, could increase Canada’s crude exports to the U.S. by 12%, adding much-needed Canadian pipeline capacity.

South Bow, working with U.S. partner Bridger Pipeline on the proposal, said it has secured 20-year binding contracts from oil companies through a process launched this year to gauge commercial interest. Reuters reported this month that South Bow was close to reaching its goal of securing 450,000 bpd, or 80% of initial pipeline capacity, citing sources.


Get the Latest US Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


PIPELINE PARTLY ASSEMBLED IN CANADA

South Bow spun off from former Keystone XL proponent TC Energy in 2024 to take over its oil ​pipeline business.

While the new pipeline does not follow the same U.S. route as an earlier project that was cancelled in 2021 when former President Joe Biden revoked its permit, it would use some of the already-assembled Keystone XL pipe on the Canadian side of the border.

U.S. President Donald Trump has signed an order granting a cross-border permit to the new proposal. But South Bow CEO Bevin Wirzba on Thursday the company cannot proceed unless it has evidence that permit is “durable,” and will not be revoked by a future administration.

MicroWatt Controls: Instrumentation & Safety System Experts
TrueFlow Technologies
Shocker Edge

While the successful open season to secure shipper commitments achieves a significant milestone, there is lingering risk about the U.S. permit, said TPH Energy analyst AJ O’Donnell.

“Without assurances that a new U.S. administration would not revoke the permits in 2029, as Biden did with KXL, the project is likely to be stalled,” O’Donnell said.

South Bow has not publicly put a pricetag on its project, but ATB Capital Markets analysts said it could cost $2.2 billion (C$3 billion) and take two to three years to build after an investment decision.

Canada, the world’s fourth-largest oil supplier, produces 5.5 million bpd. Forecasts suggest that could climb to 6.1 million bpd by 2030.

Reporting by Amanda Stephenson in Calgary and Arathy Somasekhar in Houston Editing by Rod Nickel

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE