Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Zachry Integrity Engineering
Copper Tip Energy Services
Copper Tip Energy
Zachry Integrity Engineering


Venture Global’s CP2 LNG Plant Costs Increase by $4 Billion


These translations are done via Google Translate

venture global flop swiftly wipes out $39 billion after ipo

(Reuters) – The anticipated construction cost for two phases of Venture Global’s CP2 LNG liquified natural gas project has jumped by $4 billion, or just under 14%, the company said in an annual report released earlier this week.

It cited design modifications, inflation and the potential impact of tariffs imposed by U.S. President Donald Trump,

MicroWatt Controls: Instrumentation & Safety System Experts
Shocker Edge

Venture Global is the second largest LNG exporter in the U.S. and was responsible for most of the output growth in the country last year. The company is currently constructing phase one of the 35 million metric tons per annum facility in Louisiana.

  • Venture Global estimates the cost of building the plant at between $32.5 billion and $33.5 billion, up from a previous $28 billion to $29.5 billion.
  • Venture Global imports modular plants from Italy then puts them together in the U.S.
  • Venture Global did not immediately reply to a request for comment.
  • As of December 31, 2025, the CP2 Project had 3.0 mtpa of nameplate capacity that had not yet been sold under a long term contract, Venture Global said.

Reporting by Curtis Williams in Houston; Editing by Nathan Crooks and Cynthia Osterman

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE