Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Zachry Integrity Engineering
Copper Tip Energy Services
Copper Tip Energy
Zachry Integrity Engineering


Cheniere Submits Application to Build Massive LNG Plant in Texas


These translations are done via Google Translate

By Curtis Williams

  • Cheniere plans 24 mtpa LNG plant expansion in Texas
  • Expansion to add four new LNG processing trains
  • Cheniere aims for federal approval by May next year

HOUSTON, Feb 5 (Reuters) – Cheniere Energy, the largest liquefied natural gas exporter in the U.S., has submitted an application to build a 24 million metric tonnes per annum LNG plant at its Corpus Christi location in Texas, according to a filing with the Federal Energy Regulatory Commission.


Get the Latest US Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


The proposed project will be an expansion of Cheniere’s Corpus Christi plant, which at present has a capacity of 18 mtpa but could soon produce as much as 25 mtpa with the ongoing Stage 3 expansion expected to be completed by the end of 2026. If the Stage 4 project is approved, Corpus Christi capacity would eventually rise to 49 mtpa.

The latest expansion would entail adding four new LNG processing plants, also called trains, that will each produce 6 mtpa of LNG, according to the filing with FERC. Cheniere expects that the Stage 4 expansion will require 3.3 billion cubic feet of gas per day and it hopes to get federal approval by May next year for the project.

MicroWatt Controls: Instrumentation & Safety System Experts
Shocker Edge

In 2025 the U.S. exported 111 million metric tonnes of LNG according to preliminary data from financial firm LSEG. The U.S. has another 100 mtpa under construction to come online between 2027 and 2030, leading to concerns by some energy majors that there could be an over supply of LNG by 2030.

With the more favorable permitting climate in the U.S., Cheniere has been in a race with Venture Global (VG.N) to be the first U.S. exporter to get to 100 mtpa.

Cheniere has a present capacity of 52 mtpa with another 8 mtpa under construction. Venture Global has a capacity of 40 mtpa with another 28 mtpa under construction.

Reporting by Curtis Williams in Houston; Editing by Nathan Crooks and Mark Porter

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE