Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Zachry Integrity Engineering
Copper Tip Energy Services
Copper Tip Energy
Zachry Integrity Engineering


Kazakhstan’s CPC Oil Pipeline Will Not Return to Full Export Capacity Before December 11, Sources Say


These translations are done via Google Translate

industrial pipelines and valves on sunset sky background, banner.(Reuters) – Kazakhstan’s Caspian Pipeline Consortium, which accounts for 1% of global crude supply, will not return to full export capacity until at least December 11 after a Ukrainian drone attack damaged a key part of its terminal, two industry sources told Reuters.

The CPC terminal, which handles around 80% of Kazakhstan’s oil exports, was damaged by a Ukrainian naval drone attack on Nov. 29, sending global oil prices up over $1 a barrel.

The CPC, which includes Russian, Kazakh and U.S. shareholders, said the attack briefly halted operations because of serious damage to Single-Point Mooring (SPM)-2 – essentially a floating buoy which connects to tankers to load oil – at the Yuzhnaya Ozereevka terminal at Novorossiysk.


Get the Latest US Focused Energy News Delivered to You! It's FREE: Quick Sign-Up Here


The terminal has three SPMs located some 5 kilometres (3.1 miles) from the shore. Usually, two SPMs load, while one stays idle as a backup.

SPM-1 remains operational, meaning the CPC is now exporting oil at around half its capacity. SPM-3 has been under maintenance since the middle of November.

Five industry sources said last week the CPC aimed to complete repairs on SPM-3 ahead of schedule.

MicroWatt Controls: Instrumentation & Safety System Experts
GLJ
Shocker Edge
Tarco | Delivering Engineered Solutions

Two sources told Reuters on Monday that SPM-3 was not expected to be back in full operation before December 11-13 due to challenging weather and complications with diving.

CPC declined to comment.

SPM-2 repairs could take months, though the precise time frame for repairs or its replacement is still being evaluated, sources said.

CPC had already diverted some of the volumes to other destinations, such as the Baku-Tbilisi-Ceyhan pipeline, however, it has no major options for re-routing bulk of its oil.

Reporting by Reuters; editing by Guy Faulconbridge and Bernadette Baum

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE