Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Hazloc Heaters
Copper Tip Energy Services
Copper Tip Energy
Hazloc Heaters


Enbridge ‘Disappointed’ as Environmental Review for Line 5 Tunnel Extended


These translations are done via Google Translate

CALGARY — The timeline of a U.S. review of a proposed Great Lakes tunnel that’s a critical part of Enbridge Inc.’s Line 5 pipeline replacement project has been pushed back by more than a year.

The U.S. Army Corps of Engineers said Thursday it now expects to complete its draft environmental impact statement for Enbridge’s Line 5 tunnel permit application in spring 2025, rather than late 2023 as earlier indicated.

The Canadian pipeline company says this will further delay the replacement of the dual pipelines in Michigan’s Straits of Mackinac and will essentially push the start of construction until at least 2026.

Tarco | Delivering Engineered Solutions
GLJ
ROO.AI Oil and Gas Field Service Software

Enbridge first submitted its application for the Great Lakes tunnel project in April 2020.

The company says the project would cover only 6.4 km in length, will require no construction within the waters of the Straits, and is anticipated to impact less than one-quarter acre of wetlands.

Michigan has been in court for years with Calgary-based Enbridge in an effort to shut down Line 5, fearing a disaster in the Straits of Mackinac, the ecologically sensitive region where the pipeline crosses the Great Lakes.

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE