Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Copper Tip Energy Services
Vista Projects
Copper Tip Energy
Vista Projects


Genesis Energy expects up to $50 million in losses due to storms: CEO


These translations are done via Google Translate

In a typical year, storms would cost the company about $8 to $10 million, he said.

The Houston offshore pipeline operator’s oil and gas pipeline volumes fell as hurricanes Marco and Laura tore through the central Gulf of Mexico region and halted roughly two weeks of production in the three months ended Sept. 30, Sims said.

Hurricanes Delta and Zeta caused another 15 days of disruption to Genesis Energy’s pipeline systems in the current quarter, adding to expenses, Sims said.

ROO.AI Oil and Gas Field Service Software
GLJ

Genesis is still working to get its 380-mile (610-km) Cameron Highway Oil Pipeline System (CHOPS) back to normal after the hurricanes caused structural damage to a platform within the system.

Crude oil shipped on CHOPS, which is delivered to the Texas coast and sold as Southern Green Canyon WTM-SGC, is being rerouted and delivered into the Poseidon pipeline system or the Auger pipeline, while the damage is investigated.

Genesis Energy’s quarterly revenues were $443.1 million in the three months ended Sept. 30, compared to $621.7 million for the same period last year.



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE