Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Copper Tip Energy Services
Hazloc Heaters
Copper Tip Energy
Hazloc Heaters


Large Crude Unit, Coker Shut at Biggest U.S. Refinery


These translations are done via Google Translate

HOUSTON, Jan 8 (Reuters) – The large crude distillation unit (CDU) and coker were shut on Monday at Motiva Enterprises (MOTIV.UL) 626,000 barrel-per-day (bpd) Port Arthur, Texas refinery, the largest in the U.S., said sources familiar with plant operations.

The 350,000-bpd VPS-5 CDU and the 110,000-bpd DCU-2 coker are scheduled to remain shut for a 45-day planned overhaul.

A Motiva spokesperson did not reply to a request for comment.

In November, Motiva moved the overhaul’s scheduled start from from March to January to avoid equipment failure on DCU-2 that would cause an unplanned shutdown.

VPS-5, the largest of three CDUs at the refinery that break down crude oil into feedstocks for all other units, also needs equipment repaired and replaced, the sources said.

GLJ
Tarco | Delivering Engineered Solutions
ROO.AI Oil and Gas Field Service Software

The addition of VPS-5 in 2012 more than doubled the capacity of the refinery.

VPS-5 feeds residual crude oil to DCU-2, which converts it into either motor fuel feedstocks or petroleum coke, which can be a substitute for coal.

A sulfur recovery unit will also be shut for work while the CDU and coker are shut, the sources said.

Reporting by Erwin Seba; Editing by Kim Coghill and Rashmi Aich

 

Share This:




More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE