Sign Up for FREE Daily Energy News
Canadian Flag CDN NEWS  |  US Flag US NEWS  | TIMELY. FOCUSED. RELEVANT. FREE
  • Stay Connected
  • linkedin
  • twitter
  • facebook
  • youtube2
BREAKING NEWS:

Vista Projects
Copper Tip Energy Services
Vista Projects
Copper Tip Energy


Keystone Oil Pipeline Still at Reduced Pressure: Spokesman


English Español 简体中文 हिन्दी Português
These translations are done via Google Translate

January 23, 2018, by Devika Krishna Kumar

NEW YORK (Reuters) – TransCanada Corp’s Keystone crude pipeline is still operating at 20 percent reduced pressure, a spokesman for the company said on Tuesday, more than two months after a leak forced the line to be shut.

Calgary-based TransCanada shut the 590,000 barrel-per-day pipeline, one of Canada’s main crude export routes linking Alberta to U.S. refineries, on Nov. 16 after the leak was detected.

The pipeline was restarted about two weeks later, but the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) ordered TransCanada to operate at reduced pressure after the 5,000-barrel oil leak in South Dakota. [nL1N1NY2OB]

GLJ
EnergyNow Stand Out 2023 Promo

Energy data provider Genscape said on Thursday the pipeline flow averaged an estimated 524,000 bpd last week.

The reduced flows have contributed to inventory declines at the Cushing, Oklahoma storage hub and pressured Canadian crude differentials, traders said.

PHMSA did not immediately comment on when the line would be allowed to return to full capacity.

Reporting by Devika Krishna Kumar in New York; Editing by Marguerita Choy



Share This:



More News Articles


GET ENERGYNOW’S DAILY EMAIL FOR FREE